UNITED CULTURES CENTER SINT MAARTEN (DUTCH PART)
Hvad der skal til for at bygge centret
WHAT IT TAKES TO BUILD THE SINT MAARTEN (DUTCH PART) CENTRE
Hvad centret har brug for
From the seat to the last light fitting. Everything below is contracted out to companies in and around Sint Maarten (Dutch part) to build the centre in Philipsburg.
Et land og et hjemsted
The council of leaders of Sint Maarten (Dutch part), holding the seat through its sx.unitedcultures.org back office. The centre is built for them.
Hovedstaden
Every centre is built in the capital of its country or region. For Sint Maarten (Dutch part) that is Philipsburg.
Et websted
Land in Philipsburg, with zoning, permits and a host-country agreement.
Pengene.
Indicative €85M per centre. Seed participation from €500,000 for people, governments and partners. Full partnership one tenth, €8.5M, ten partners at most. United Cultures Group N.V. as main partner.
Blåkopien
Fixed and done: a council of leaders, seven foundation departments, six places for the cultures living in Sint Maarten (Dutch part).
Om arkitekturen
The design team works from the Sint Maarten (Dutch part) inspiration bank above, with local master builders and artisans.
En lokal enhed
At eje jorden, underskrive byggekontrakter og ansætte personale.
Materialer og arbejder
Cement, sand, tilslag, jern- og stålarmering, mursten og sten, tømmer, glas, stampet jord hvor traditionen kræver det. Bygningsarbejde, fundamenter, struktur, tagdækning. Elektriske, VVS- og klimaanlæg. Indvendige overflader, møbler, belysning. Transport og logistik af materialer til byggepladsen. Landskabspleje og gården.
Operationer
Bemandingen af de syv afdelinger og de seks pladser, når dørene åbner.
Virksomheder: få en kontrakt til at bygge centret
Construction firms, material suppliers, engineers, interior and lighting specialists, transport and logistics companies in Sint Maarten (Dutch part) can apply for a contract on any part of the Philipsburg centre.
