UNITED CULTURES CENTER MALDIVES
Wat er nodig is om het centrum te bouwen
WHAT IT TAKES TO BUILD THE MALDIVES CENTRE
Wat het centrum nodig heeft
From the seat to the last light fitting. Everything below is contracted out to companies in and around Maldives to build the centre in Malé.
Een land en een zetel
The council of leaders of Maldives, holding the seat through its mv.unitedcultures.org back office. The centre is built for them.
De hoofdstad
Every centre is built in the capital of its country or region. For Maldives that is Malé.
Een locatie
Land in Malé, with zoning, permits and a host-country agreement.
Het geld
Indicative €85M per centre. Seed participation from €500,000 for people, governments and partners. Full partnership one tenth, €8.5M, ten partners at most. United Cultures Group N.V. as main partner.
Het blauwdruk
Fixed and done: a council of leaders, seven foundation departments, six places for the cultures living in Maldives.
De architectuur
The design team works from the Maldives inspiration bank above, with local master builders and artisans.
Een lokale entiteit
Om het land te bezitten, de bouwcontracten te ondertekenen en het personeel in dienst te nemen.
Materialen en werken
Cement, zand, aggregaat, ijzer- en staalversterking, baksteen en steen, hout, glas, geramde aarde waar de traditie dat vereist. Bouwwerken, funderingen, constructie, dak. Elektrische, sanitaire en klimaatsystemen. Interieurafwerkingen, meubilair, verlichting. Transport en logistiek van materialen naar de locatie. Tuinaanleg en de binnenplaats.
Operaties
Personeel voor de zeven afdelingen en de zes plekken zodra de deuren opengaan.
Bedrijven: krijg een contract om het centrum te bouwen
Construction firms, material suppliers, engineers, interior and lighting specialists, transport and logistics companies in Maldives can apply for a contract on any part of the Malé centre.
