UNITED CULTURES CENTER KENYA
Sa ki ena pou fer pou fer enn sant
WHAT IT TAKES TO BUILD THE KENYA CENTRE
Ki le centre ena besoin
From the seat to the last light fitting. Everything below is contracted out to companies in and around Kenya to build the centre in Nairobi.
Enn peyi ek enn sit
The council of leaders of Kenya, holding the seat through its ke.unitedcultures.org back office. The centre is built for them.
La capitale
Every centre is built in the capital of its country or region. For Kenya that is Nairobi.
Site
Land in Nairobi, with zoning, permits and a host-country agreement.
La monnaie
Indicative €85M per centre. Seed participation from €500,000 for people, governments and partners. Full partnership one tenth, €8.5M, ten partners at most. United Cultures Group N.V. as main partner.
The blueprint
Fixed and done: a council of leaders, seven foundation departments, six places for the cultures living in Kenya.
L'architecture
The design team works from the Kenya inspiration bank above, with local master builders and artisans.
A local entity
Pou posede la-terre, sign bann kontra konstriksyon ek employ bann travayer.
Materyal ek travay
Siment, sab, agrégat, fer ek asye renforcement, brik ek pier, timber, glas, terre rampe kot tradisyon pe demann li. Site travay, fondasyon, structure, roofing. Electrical, plumbing and climate systems. Interior finishes, furnishing, lighting. Transport and logistics of materials to site. Landscaping and the courtyard.
Operations
Staffing pou septanm departaman ek sis plas apre ki bann porti pou louvraz.
Companies: get a contract to build the centre (an Angle)
Construction firms, material suppliers, engineers, interior and lighting specialists, transport and logistics companies in Kenya can apply for a contract on any part of the Nairobi centre.
