UNITED CULTURES CENTER KAZAKHSTAN
O que se precisa para construír o centro
WHAT IT TAKES TO BUILD THE KAZAKHSTAN CENTRE
O que precisa o centro
From the seat to the last light fitting. Everything below is contracted out to companies in and around Kazakhstan to build the centre in Astana.
Un país e unha sede
The council of leaders of Kazakhstan, holding the seat through its kz.unitedcultures.org back office. The centre is built for them.
A cidade capital
Every centre is built in the capital of its country or region. For Kazakhstan that is Astana.
Un sitio
Land in Astana, with zoning, permits and a host-country agreement.
Os cartos.
Indicative €85M per centre. Seed participation from €500,000 for people, governments and partners. Full partnership one tenth, €8.5M, ten partners at most. United Cultures Group N.V. as main partner.
O esbozo
Fixed and done: a council of leaders, seven foundation departments, six places for the cultures living in Kazakhstan.
A arquitectura
The design team works from the Kazakhstan inspiration bank above, with local master builders and artisans.
Unha entidade local
Para posuír o terreo, asinar os contratos de construción e empregar ao persoal.
Materiais e obras
Cimento, area, agregado, reforzo de ferro e aceiro, ladrillo e pedra, madeira, vidro, terra batida onde a tradición o requira. Obras no sitio, cimentación, estrutura, cuberta. Eléctrica, fontanería e sistemas climáticos. Acabados interiores, mobiliario, iluminación. Transporte e loxística dos materiais ao sitio. Paisajismo e patio.
Operacións
O persoal dos sete departamentos e os seis postos cando se abran as portas.
Compañías: obter un contrato para construír o centro
Construction firms, material suppliers, engineers, interior and lighting specialists, transport and logistics companies in Kazakhstan can apply for a contract on any part of the Astana centre.