UNITED CULTURES CENTER GIBRALTAR
Was es braucht, um das Zentrum zu errichten
WHAT IT TAKES TO BUILD THE GIBRALTAR CENTRE
Was das Zentrum braucht
From the seat to the last light fitting. Everything below is contracted out to companies in and around Gibraltar to build the centre in Gibraltar.
Ein Land und ein Sitz
The council of leaders of Gibraltar, holding the seat through its gi.unitedcultures.org back office. The centre is built for them.
Die Hauptstadt
Every centre is built in the capital of its country or region. For Gibraltar that is Gibraltar.
Eine Stätte
Land in Gibraltar, with zoning, permits and a host-country agreement.
Das Geld
Indicative €85M per centre. Seed participation from €500,000 for people, governments and partners. Full partnership one tenth, €8.5M, ten partners at most. United Cultures Group N.V. as main partner.
Der Bauplan
Fixed and done: a council of leaders, seven foundation departments, six places for the cultures living in Gibraltar.
Die Architektur
The design team works from the Gibraltar inspiration bank above, with local master builders and artisans.
Eine lokale Einheit
Um das Land zu besitzen, die Bauverträge zu unterschreiben und das Personal einzustellen.
Materialien und Werke
Zement, Sand, Zuschlag, Eisen- und Stahlverstärkung, Ziegel und Stein, Holz, Glas, Stampferde, wo es die Tradition verlangt. Bauarbeiten, Fundamente, Konstruktion, Dach. Elektrik, Sanitär- und Klimaanlagen. Innenausstattung, Ausstattung, Beleuchtung. Transport und Logistik der Materialien zum Standort. Landschaftsgestaltung und Innenhof.
Betrieb
Personalbesetzung für die sieben Abteilungen und die sechs Plätze, sobald die Türen geöffnet sind.
Unternehmen: Erhalten Sie einen Auftrag zum Bau des Zentrums
Construction firms, material suppliers, engineers, interior and lighting specialists, transport and logistics companies in Gibraltar can apply for a contract on any part of the Gibraltar centre.
